It was necessary to replace the existing two-level conveyor in the iron ore pre-processing plant. During the project, a new two-level belt conveyor with three different chutes was implemented.
Overview
One of the chutes was equipped with a vibrating motor to avoid material accumulation, the other with a pneumatic valve and the third with a material flow divider. The transportation line was fully automated and equipped with passive/active safety solutions that provide employees with a comfortable and safe work environment.
Area
Sweden – Iron ore processing plant
Industry
Mining
Services
Detail Design, Manufacturing Drawings/Files