To increase efficiency and ensure long-term reliability, a full-scale reconstruction of a screening station at a Norwegian mining facility was carried out. The project scope included the installation of new dolomite screeners and the redesign of the existing screening station to handle higher loads under demanding conditions. Two independent screening stands were engineered, complemented by hydraulically operable Rock Boxes that optimized material handling, minimized spillage, and improved durability.
Relocating the screening equipment within the factory required significant modifications to the existing infrastructure. SketchArt Engineering developed customized extensions for the belt conveyors to ensure precise compatibility with the original conveyor system. These adjustments eliminated the risk of misalignment while maintaining a seamless integration between old and new equipment.




