The construction of a new coal handling terminal in Riga required the development of specialized bulk material handling equipment to meet the high operational demands of a modern port. SketchArt Engineering was responsible for the design and implementation of key equipment that ensures safe, reliable, and efficient handling of coal during unloading, processing, and ship loading operations.
The project included two mobile belt conveyors and a dedicated magnetic frame station engineered to improve coal processing quality. A unique movable frame with a powerful industrial magnet was installed above the main conveyor belt. This system effectively removes metal contaminants from the coal stream, preventing equipment damage and guaranteeing consistent product quality. The integration of this feature provided both operational safety and extended equipment service life.




