Home » Services » Two level belt conveyors

Overview

The replacement of an outdated two-level conveyor at an iron ore pre-processing plant was essential to improve efficiency and functionality. As part of this project, a new two-level belt conveyor system was designed and implemented, featuring three advanced chutes tailored to the plant’s operational needs. This upgrade aimed to enhance material handling and ensure smoother processing workflows.

 

Each chute in the new conveyor system was equipped with specialized features for optimized performance. One chute included a vibrating motor to prevent material accumulation, another was fitted with a pneumatic valve for precise control, and the third featured a material flow divider to streamline distribution.

The entire transportation line was fully automated, incorporating both passive and active safety solutions. These measures were implemented to ensure a safe and comfortable work environment for employees, while simultaneously boosting the plant’s productivity and operational reliability.

Area

Sweden – Iron ore processing plant

Industry

Mining

Services

Detail Design, Manufacturing Drawings/Files